Company Logo

Operator PLTD Lombok

This job post is managed by

SA
Siti Ayu Khodiah

Job Requirements

On-site
1 - 3 years of experience
Minimum Senior/Vocational High School
18-30 years old
Male only

Skills

System Operation And Maintenance

Machine Operator

Electrical Maintenance

Preventive Maintenance

Mechanical Maintenance

Job Benefits

Training/Certification

Annual Leave

Yearly Bonus

THR

Work Insurance

Overtime Pay

Transport Money

Health Insurance

Meal Allowance

Dormitory

Job description for Operator PLTD Lombok at PT Megadaya Tangguh

Operator PLTD Lombok


PT Space Technology Group (PT Megadaya Tangguh) is seeking a qualified Operator to join our team at PLTD Jeranjang, Kab. Lombok Barat site.

Job Description:

  • Operate diesel power plant (PLTD) machines in accordance with SOP and supervisor instructions
  • Monitor engine parameters routinely and record them in log sheets
  • Ensure stable and reliable electricity distribution to PLN grid in accordance with capacity
  • Record daily production meters and fuel flow meter usage
  • Report production results and coordinate with the administration team for billing recap
  • Identify potential machine issues (visual and audible) and report to maintenance team
  • Coordinate with fuel personnel to ensure availability and smooth fuel supply
  • Monitor protection systems, cooling systems, lubrication systems, and distribution panels
  • Report any operational anomalies to Supervisor for immediate action
  • Maintain cleanliness, safety, and readiness of work area and equipment

Job Requirements:

  • Minimum SMK / D3 / S1 in Electrical Engineering or related field
  • Experience as power plant operator (PLTD experience is preferred)
  • Understanding of diesel engine systems and power plant operations
  • Able to read and understand basic technical parameters and panel systems
  • Good discipline, responsibility, and teamwork
  • Able to work in shifts
  • Willing to be placed in Lombok, NTB
  • Preferably domiciled in Lombok / local candidates are prioritized
About the company
PT Megadaya Tangguh
Electrical/Electronic Manufacturing
51 - 200 employees

PT Space Technology is a long-established Indonesian Engineering, Procurement, and Construction (EPC) company with deep expertise in mechanical, electrical, and power plant engineering solutions. Founded in 2002, the company has successfully executed EPC projects across a wide range of sectors in Indonesia, delivering high-quality services that align with international standards and client expectations.

Our core focus is on creating value for customers through innovative engineering and manufacturing, backed by a strong commitment to safety, sustainability, and operational excellence. We specialize in EPC services for power plants and industrial facilities, offering tailored solutions from design and procurement to construction, installation, testing, and commissioning.

Vision

To become a leading EPC company in Indonesia known for reliability, innovation, and sustainability in supporting national energy security and infrastructure development.

Mission

Driven by integrity and professionalism, PT Space Technology is committed to delivering integrated, high-quality EPC solutions and advancing national energy infrastructure through the operation of efficient, environmentally friendly power plants. We prioritize technological innovation, cost efficiency, safety, and a healthy work environment while contributing to environmental and social sustainability in every project we undertake.

Core Values

We uphold quality born of integrity, continuous innovation, uncompromising safety, synergistic collaboration, value-oriented efficiency, and environmental and social sustainability — these principles guide every decision and action within our organization.

Quality Policy

PT Space Technology embraces quality with integrity by encouraging continuous innovation, upholding the highest safety standards, strengthening cross-functional collaboration, and ensuring sustainability throughout all processes and services.

Slogan

“Illuminating the Future with Integrity and Innovation.”

What We Do

PT Space Technology offers an extensive portfolio of engineering and technical services, including but not limited to:

  • Power Plant Engineering & EPC Services – customized design and construction for reliable and efficient energy systems.
  • Mechanical Engineering – creative and robust mechanical solutions aligned with client needs.
  • Electrical Engineering – comprehensive electrical system design, analysis, upgrades, and installations for varied applications.
  • Structural & Construction Services – civil, steel fabrication, erection, and project execution services.

We also operate and support power plants, such as a 30 MW diesel power plant in Pontianak, contributing to regional energy stability and development.

Headquarters & Contact

Head Office – Jl. Damar Blok F1 - 03 Kawasan Industri Delta Silicon II Lippo, Cibatu, Cikarang Sel., Kabupaten Bekasi, Jawa Barat 17550.

Telephone : +62-21-8990 2215 ( Hunting)

Facsimile : +62-21-8990 2223

E-Mail Address

To : [email protected]

Office address

Jl. Damar Blok F1 - 03 Kawasan Industri Delta Silicon II Lippo, Cibatu, Cikarang Sel., Kabupaten Bekasi, Jawa Barat 17550

Glints Safety Tips

Legitimate employers won’t ask for contact Telegram or any kind of top-ups or payment. Do not provide your messaging app contacts, bank details, or credit card information.

Learn More

Operator PLTD Lombok